Why This Guide Exists
Every township in our service area requires a permit before you build a new driveway entrance or alter an existing one onto a public road , but each one runs its own process, sets its own fees, and has its own culvert specifications. We coordinate this application on every project where it applies, but homeowners and builders planning ahead deserve a straight answer on what to expect before calling anyone. This guide covers all 8 townships across Simcoe County and Muskoka in one place.
A quick note on accuracy: municipal fee schedules change, typically reviewed annually, and not every township publishes its current fee amount online. Where we found a specific, current figure, it's below. Where we couldn't confirm one from public sources, it's marked "Call to confirm" , check with the township directly for that number before budgeting around it, and we'll confirm it again for you during your site visit regardless.
The 8-Township Comparison
Severn
Permit fee: $153.90 + HST (includes final route inspection)
Additional inspections: $102.60 + HST per additional inspection
Deposit: Security deposit may be required, set by Public Works
Contact: forms.severn.ca , online Entrance Permit Application
Notes: Fee schedule is published directly in the township's Entrance Permit By-law.
We build and repair driveways throughout Severn Township , see our Severn driveway page.
Coldwater falls within Severn for permitting purposes; local pricing and terrain notes are on our Coldwater driveway page.
Oro-Medonte
Permit fee: Call to confirm , published in the Township's Fees & Charges By-law
Additional inspections: Call to confirm
Deposit: Call to confirm
Contact: Operations & Community Services — 705-487-2171
Notes: Driveway culverts longer than 7.0 m specifically require Township approval before installation.
Ramara
Permit fee: Call to confirm , outlined directly on the application form, not published separately online
Additional inspections: Call to confirm
Deposit: Call to confirm
Contact: 705-484-5374 / ramara@ramara.ca
Notes: Township confirms culvert size (if needed) after reviewing the staked entrance location.
For Ramara-specific pricing and terrain notes, visit our Ramara Township driveway page.
Tay
Permit fee: Call to confirm , paid at time of permit pickup, amount not published online
Additional inspections: Call to confirm
Deposit: Call to confirm
Contact: 705-534-7248
Notes: Property owner supplies and installs the culvert to Township specification; new entrances tied to a build must appear on the Lot Grading Plan at time of application.
Orillia
Permit fee: $120 (includes one final inspection)
Additional inspections: $160 per additional inspection
Deposit: $500 (low-density residential) / $2,000 (medium/high-density, commercial, industrial, institutional)
Contact: infrastructureplanning@orillia.ca
Notes: Used culvert material costs $8/metre; new culvert installation and lowering charged at actual cost.
Planning driveway work in Orillia? Our Orillia driveway construction page has local pricing and ground-condition detail.
Gravenhurst
Permit fee: Per current Fees & Charges By-law (includes 2 inspections)
Additional inspections: Call to confirm
Deposit: Environmental fee deposit required , expires 2 years from purchase date
Contact: INF-Permits@gravenhurst.ca
Notes: Application reviewed by Public Works/Infrastructure Services at the property owner's expense.
We cover Gravenhurst's terrain and grade challenges in more depth on our dedicated Gravenhurst page.
Bracebridge
Permit fee: Per current Fees & Charges By-law, applied after initial site inspection
Additional inspections: Call to confirm
Deposit: Per current Fees & Charges By-law
Contact: Town of Bracebridge Public Works
Notes: If your driveway abuts a District of Muskoka road (a specific listed set of District roads), a separate District Road Occupancy Permit is required in addition to the Town permit. Minimum culvert size 400 mm, minimum length 7 m.
Bracebridge property owners can get an instant online estimate on our Bracebridge driveway page.
Huntsville
Permit fee: Per current Fees & Charges By-law (non-refundable)
Additional inspections: Call to confirm
Deposit: Required at time of application, per current by-law
Contact: 705-789-1751 ext. 3821
Notes: Permit is valid for 1 year from date of issue. A separate District of Muskoka Road Occupancy Permit applies if the driveway abuts a District roadway.
For pricing and remote-access considerations specific to Huntsville, see our Huntsville driveway page.
What the Process Generally Looks Like
Despite the differences in fees and specific forms, the underlying process is similar across all 8 townships: you submit an application identifying the proposed entrance location (often requiring you to physically stake it on your property), the township reviews the location and determines whether a culvert is needed and what size, the work is completed to the township's specification, and a final inspection confirms it before the permit is closed out and any deposit is returned.
Skipping straight to construction without this process risks the township requiring the work redone to standard , and more practically, risks an entrance and culvert that isn't properly sized for that specific ditch's drainage, which is a common cause of the washouts we get called out to repair every spring.
District of Muskoka Roads: A Second Layer for Bracebridge, Gravenhurst & Huntsville
Within the three Muskoka towns we serve, some roads are municipal (town-owned) and some are District of Muskoka roads , a specific, named list in each town's jurisdiction instead of a simple in-town/rural split. If your driveway touches a District road, a District Road Occupancy Permit applies in addition to, or instead of, the town's own entrance permit, and it's administered separately through the District's own permit system. We identify which authority governs your specific road as part of our site visit, since guessing wrong here is a common source of permit delays.
Timing: Why Spring Isn't the Best Time to Start This Process
Entrance permit applications across our entire service area spike every spring, as the same seasonal window that's best for driveway construction is also when every township's public works department is fielding the most applications. If your project timeline depends on a spring start, starting the permit application in late winter gives you meaningfully more scheduling flexibility than waiting until the ground has thawed to begin the paperwork.
How We Handle This
We coordinate the entrance permit application and culvert installation as part of every driveway build that needs one, regardless of which of the 8 townships your property falls in. That means confirming the current fee, deposit, and culvert specification directly with the relevant authority before your project is quoted as final, not relying on a guide like this one that can go stale between updates.
For a realistic price range on your specific driveway project, including any entrance and culvert work, use our online estimator , it accounts for whether you need a new entrance directly in the questions.
Driveway Entrance Permits — Frequently Asked Questions
Do I need a permit just to regrade or resurface an existing driveway?
Generally no, as long as the entrance location, width, and use aren't changing , regrading or adding fresh gravel to an existing driveway on an existing entrance typically doesn't require a new permit. Widening an entrance, relocating it, or changing its use (residential to commercial, for example) usually does. Confirm with your specific township if you're not sure which category your project falls into.
What happens if I build a new entrance without a permit?
Townships can require the work to be redone to standard, and in some cases can charge additional fees or take enforcement action for unpermitted road-allowance work. It's also a real practical risk: an entrance and culvert built without township sizing guidance can end up undersized for that ditch's drainage, causing washouts or flooding that a permitted, properly sized culvert would have avoided.
How long does entrance permit approval typically take?
It varies by township and season , spring is typically the busiest period for entrance permit applications across our service area, so processing can take longer than in fall or winter. As a general rule, we recommend starting the application at least a few weeks ahead of your target construction date, and checking directly with your township for their current processing timeline before locking in a hard schedule.
My driveway touches a District of Muskoka road, not a town road , does that change anything?
Yes. In Bracebridge, Gravenhurst, and Huntsville, some roads are under the District Municipality of Muskoka instead of the local town, which means a separate District Road Occupancy Permit applies in addition to (or instead of) the town's own entrance permit process. We help identify which authority governs your specific road as part of our site visit.
Get Your Driveway Estimate — Entrance Work Included
Tell us whether you need a new entrance and our estimator factors it in directly.
Get Your Free Driveway EstimateOr call us: (647) 697-7549